Home Map Site mapFaq Links Contact us Latest News
Welcome to RHIAB
Airlines / Flight info
Tourist Info
Passengers Services
Departments
Weather Forecast
Statistics
Opinion Matters
www.lebcaa.com
 
 

Beirut Rafic Hariri International Airport

Beirut Rafic Hariri International Airport (B.R.H.I.A) is a vital facility that plays a major role in linking Lebanon with the outside world and enriches the business and touristic sectors of the economy. Therefore, it's development will bring about a substantial increase in the number of tourists, particularly businessmen as well as attracting major airline companies and increasing transit traffic.

The positive impact of this development on the Lebanese economy will also be marking on both - short and long run. The competitiveness and efficiency of the local industries will increase in order to better serve the tourists and businessmen. RHIAB is located in the Khaldeh suburb south of the capital and around 8kms distant from Beirut downtown. It was opened in 1954 and is the only civil airport in the country. The old airport was renovated in 1977, and the present runways were rehabilitated between 1982 and 1984. The Israeli invasion of 1982 caused considerable damage to most sections of the old terminal building.

The execution of the first phase of the new airport started in 1994 and was inaugurated in 1998. However, the second phase was inaugurated on the fifth of July 2000 and the operation started on the sixth of  June 2002. The total area covered by RHIAB is around 7 million square meters and the overall area of the terminal building is 150000 square meters. RHIAB has been redeveloped to handle 6 million passengers per year and to receive 30 aircrafts at the same time. It has 84 passenger counters, 21 passenger gates, and the parking area has a capacity of 2250 cars. Future development plans aim at handling 16 million passengers by the year 2035



RHIAB View from the airfield

Airport Rehabilitation and Development Project

This ambitious project includes the construction of new buildings and the rehabilitation of old areas, as detailed below:

  • The new terminal building
  • The new fire fighting building
  • The Cargo Facility
  • The new power plant
  • The Chiller plant
  • Maintenance and warehouses building
  • The ground services building
  • The Civil Aviation Safety Center
  • The Civil Aviation technical school
  • The Radar building
  • The new General Aviation building
  • The Fuel Farm
  • The Parking Facility
  • Two new runways
Other projects include the VIP building, building for customs, Freight Forwarders.

The terminal building:
In June 2000 the phase 2 was completed and the overall area of the terminal building is 150000 square meters. The terminal building consists of 4 levels:

The lower level:

The total area of the lower level is 30000 square meters and contains mainly utilities and warehouses. It includes the surveillance, electrical, and telecommunication equipment, MEA offices and stores.

The ground floor:

The total area of the ground floor is 55000 square meters and includes the following:



Construction works - Phase2

The arrivals hall: The total area of this hall is 40000 square meters and includes the following:

  • Offices and Counters for general Security
  • Offices and counters for customs
  • 200 square meters shopping area and duty free zone
  • Bank
  • Five conveyor belts,

The meeter and greeter hall: This hall is of a total area of 6000 square meters and is composed of:

  • Car rental agencies' offices and counters
  • Counters and offices for tourist services and hotels
  • Health office
  • Lost and found offices
  • Shopping area
  • Cafeteria

The airline companies' offices on the aprons:
The total area of the offices is 6000 square meters and includes the offices of the ground handling companies, civil aviation, and the security offices.

The luggage arrival
The total area of the luggage arrival is 6400 square meters

The first floor:

  • The total area of the first floor is 5500 square meters and includes the following:

    • The head office of the airport bank
    • The ticket selling counters
    • Shopping area
    • The post office
    • The custom office
  • The departures hall: The area of the hall's area is 15000 square meters and includes :

    • The luggage control
    • The Customs counters (8)
    • The Airline counters (84 in total)
    • The General security counters (22)
    • Bank counter
    • VAT claim counter
    • Insurance counter
    • Luggage surveillance equipment(6)
  • The airline companies' offices (60 in total)

  • The duty free zone : The area of the duty free zone is 6000 square meters and includes diverse shopping facilities, a cafeteria and a transit restaurant.

  • The departure lounges: Cover a total area of 10000 square meters

  • The gates: 21 gates in total.

The second floor

with a total area of 30000 square meters host mainly the offices of the Directorate General of Civil Aviation

  • The offices of the Directorate General of Civil Aviation
  • The Airport security offices
  • The Airline offices
  • The healthoffice
  • The office of the Ministry of information
  • 4 VIPlounges
  • 3 Business lounges
  • 2 Restaurants

The third floor

The total area is 10000 square meters and it hosts the tower and the technical services of the civil aviation. This includes the air navigation, the communication, and the maintenance department.

The presidential lounge
The total area of the presidential building is 4000 square meters and includes :

Presidential lounges
Press lounges and offices
Information lounges and offices

The VIP Building
The total area of the VIP building is 1650 square meters. It consists of:

  • The Ministry of Foreign Affairs office
  • Diplomatic lounge
  • Business lounges
  • Information offices
  • Civil aviation office
  • Airport Security office
  • Cafeteria

The new fire fighting building
The total area of the fire fighting building is 2000 square meters and is equipped with 6 modern fire fighting vehicules.


Fire Fighting Building

The Cargo Facility Building
The total area of the building is 10000 square meters and spreads on three levels. It is the center for incoming and outgoing air cargo. It contains offices for airlines, customs, security and warehouses.

Chiller plant and power generation plant
The total area of the building is 5400 square meters and includes 9 generator sets and  3 chillers with their respective control panels.

The maintenance and warehouses building
The total area of the maintenance and warehouse building is 3400 square meters.

The ground services building
The total area is of 13800 square meters. It consists of three levels:
It is used as maintenance garages for the airline transportation equipment , and rest area for airport personnel

Civil Aviation Safety Center
Situated on an area of 5500 square meters.

Civil Aviation Technical School
The total area of the technical school is 2000 square meters. The Center is equipped with the latest training equipment. It is in the process of being re-activated .

Radar Building
The total area of the Radar building is 600 square meters and it hosts the radar equipment.

General Aviation Facility
The total assigned area is 72000 square meteres. It includes one common general aviation terminal with parking and maintenance areas.

The Fuel Farm

Occupy 100000 square meters surface.

Parking Facility
The first phase has been inaugurated on march 1999 with a capacity of 1250 cars. However, the operation of the total project begins early 2001 at a capacity of 2350 cars, with 9 entrances and 9 exits.

The two new runways
  • The eastern runway: (21/3) Total length 3800 meters, and of a width of 60 meters.

  • The maritime runway: (35/17) Total length 3400 meters (1900 meters within the sea) and of a width of 60 meters.



 

 

In collaboration with the Computer Department-Directorate General of Civil Aviation